I ran MC, and got results. Under the "Simulation Runs (1000)" tab, there are 7 tabs. One of them is Profit % and another is APR. I thought that those two will be the same number, but they are not. Why is that? Thanks
Size:
Color:
Profit % is the total percent profit over the test period. APR is the annualized measure of Profit %.
Size:
Color: