Hi,
I am a day trader. And want to set the "Date Range " to 1 day for backtest.
But it always show error that "Start Date must before End Date". So I have to test at least two days Bar.
Is anybody know how to set day range to 1 day.
Thanks
Size:
Color:
Hi,
Not sure if you're not pulling my leg with "1 day
backtest". Nonetheless, this is by design. Although you can't override this, a workaround is to set your strategy to only process trades on the last day:
CODE:
Please log in to see this code.
Size:
Color:
Thanks a lot.
Is any way to do it in control panel as attached plot? I am not familiar with C language.
Size:
Color:
If you still have any question please
carefully reread my reply:
QUOTE:
Nonetheless, this is by design. Although you can't override this,